Concreting in Hot Weather

There are three main problems with concrete in hot weather:

  1. False setting time of cement/concrete
  2. Low early strength
  3. Incomplete hydration
Image result for concreting in hot weather
concreting in hot weather

Quality control measures for concreting in hot weathers:

  • Cooling of aggregates.
  • Use of ice flakes in mixing water.
  • Use of low heat cement.
  • Use of admixtures.
  • Protecting fresh concrete by insulating membranes .
  • Schedule concrete placements to limit exposure to atmospheric conditions (i.e. at night or during favorable weather conditions).

Watch Technical video’s related to civil engineering on our YouTube channel We Civil Engineers

Comment Here

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s